In the year 2015 Millwork shop drawings are expected to be required more than ever by Architects.
The main reason is that Architects no longer want to accept the liability for Millwork that is represented in a conceptual way on the Architectural drawings. Architects are pushing for Millworkers to show that they fully understand the scope of work and the intended finished results.